Jump to content

MickieMackieMoo

Regular Members
  • Posts

    57
  • Joined

  • Last visited

Posts posted by MickieMackieMoo

  1. I’ve been suppling and operating lighting and sound equipment in the same venue / hall for 20 years, However new office folks are now asking me to ensure all equipment is now pat tested before being used at z place.

    I have a detailed catalogue/inventory for all the equipment down to each power cable.

    I maintain them thoroughly, practically stripping and rebuilding my moving heads units every 3 months for example. Which is all logged and detailed!

    I would say my maintenance is much more thorough than a bog-standard pat test and documented(hoping this will suffice)  

    Have any of you come up with other ways to satisfy venues without pat testing?

  2. Some time ago I ordered a load of these style white plugs with around 6 inches of cable to repair moving light looms

    its been that long since I repaired a loom, that I've forgotten the name of this style connector and where I got them from.. Any pointers ? 

    Picture is just an example of the plug looking for various sizes, 

    Link to picture

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.