Jump to content

stillwave

Regular Members
  • Posts

    97
  • Joined

  • Last visited

Previous Fields

  • Member Status
    Working in the industry
  • Current Employment or place of study
    Deputy Technical Manager, Stockport Plaza Theatre
  • Full Name
    Ben Eric Wainwright

Contact Methods

  • Website URL
    http://www.stillwave.co.uk
  • ICQ
    0

Profile Information

  • Location
    South Manchester
  • Interests
    Musicals,
    Old Architecture
    Photography
    3d Printing

stillwave's Achievements

Journeyman

Journeyman (7/14)

  • First Post
  • Collaborator
  • Conversation Starter
  • Week One Done
  • One Month Later

Recent Badges

  1. Update: yay, suspected offending resistor was the cause. G300 belching haze again!
  2. Still no response from lemaitre email, no luck with the phone numbers listed on the website. After many nights hunched over the board individually removing components noting their identification on the board & measuring values, I have now reverse engineered the schematic & think I've found the offending resistor. Hopefully makes BigClive proud with his videos giving me the confidence to trace the circuits & produce a schematic from them (that & lack of comms from LeMaitre meant it's do or die for the machine anyhow!) Here's hoping LeMaitre pull through, always been a pleasure in dealing with them.
  3. Le Maitre mk2 has risen from the ashes and now all department are based in Peterborough. https://www.lemaitreltd.com/contact/ Hi Brian, I tried those phone numbers before posting but attempted several times since. I've fired off an email to the email link to see if that gets a response. Swapping the CPU board to our known working machine also operates the working machine correctly, initial probing reveals it is receiving 5v to the CPU board from the relay board. The only differences I can see between the working & nonworking machines V2 Relay boards are that the working machine has R15 & R1 populated whereas the nonworking machine has these unpopulated? The working machine has a DMX plug in module whereas the non working has a plain remote plug in module, plain remote module works on the working machine also. I was wondering if anyone could supply the schematics or technical manual for G300 mk1 specifically the V2 relay &/or V1 CPU boards or even what the expected voltages on the xlr pins for the plugin remote modules to aid in fault finding?
  4. I'm attempting to repair one of our G300 haze machines, the plug in remote module no longer springs to life with lights or the 7 segment display etc. Initial probing reveals it is receiving 5v from the CPU board but with the unfortunate liquidation of Lemaitre Ltd I'm unable to to phone the what was the very helpful technical dept there. I was wondering if anybody happened to have the schematics or technical manual for G300 mk1 specifically the V2 relay &/or V1 CPU boards to aid in fault finding?
  5. Lovely to see Multiplay back in development. Small feature request that would be useful is either when multiple audio cues are selected or could be when they're checked a total show length in the status bar akin to the sum / average of selected cells in the status bar in spreadsheets? I'm thinking for when foh staff ask how long til the interval for instance could highlight the cues up to the interval & it would sum the audio track lengths + fade times.
×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.